Negotiable
The date of payment from buyers deliver within days
Shandong
Long-term effective
2017-08-15 19:20
202
Company Profile
Qingdao SenWang Steel Structure Building Stock Co., Ltd.By certification [File Integrity]
Contact:Mr. qdsewangsteel(Mr.)
Email:
Telephone:
Phone:
Area:Shandong
Address:Shandong
Features
If you can give us below, we will offer you an entire price:
Packaging & Shipping
Foundation | Anchor bolts | Canopy | steel frame + steel sheet | |
Column | H section steel | Roof cladding | EPS sandwich panel | |
Tubular pillar | PU sandwich panel | |||
Lattice column | Rockwool sandwich panel | |||
Cross column | Corrugated steel sheet | |||
Box column | Skylight panel | |||
Beam | H section steel | Ventilator | ||
Lattice beam | Wall cladding | EPS sandwich panel | ||
Pipe truss | PU sandwich panel | |||
Space frame | Rockwool sandwich panel | |||
Roof purlin | C section steel | Corrugated steel sheet | ||
Z section steel | Mezzanine | Decking floor | ||
Wall purlin | C section steel | Checkered steel plate | ||
Tie bar | Steel pipes | Insulation | Fiber glass wool | |
Roof bracing | Angle steel | Fasteners | High strength bolts | |
Steel pipes | Common bolts | |||
Column bracing | Angle steel | Expansion bolts | ||
Steel pipes | Accessories | Flashing | ||
Pulling strap | Steel round bar | Trim | ||
Sleeves | Steel pipes | Gutter | ||
Knee bracing | Angle steel | Down pipe |
Service
Construction Stage
After-Sale Service
Company Information
FAQ
Q:Can you provide product catalog and quotation?
A:We mainly non-standard product processing,you can provide drawings(PDF or CAD),we will give you complete your drawings offer.
Q:what is you used drawing format?
A:pdf/.dwg/.igs./.stp/x_t. etc.
Q:What is the minimun order quantity?
A:No MOQ limited.
Q:What is your packing?
A:Usually wooden case and can be packed as customer's requested.
Q:How long is the delivery time?
A:According drawing decide some time within 15-30 days after receiving deposit.
Q:What is your payment?
A:T/T and western union.30% deposit and 70% balance should be made before shipment.